top of page

KRASNY BOGATYR

Russia, Moscow, Krasnobogatyrskaya Street, 2

Partners:

O. Aleksakova

Y. Burdova

Team:

V. Goncharov
I. Solomin
A. Guk
P. Benko
I. Nekrasov
E. Smolyakova
D. Garin
M. Drusinova
N. Groshev
A. Rummo
M. Sinitsyn
N. Kobtsev

​

Design: 2022

Status: Concept

Client: JSC IK Severnaya Zvezda

The site is planned to be developed in four phases. The first phase of construction is a 24-story building near the Krasnobogatyrsky Bridge, located within subzone 1. This building was previously built on the site and integrated into the current concept.

​

The urban development proposal is formed around four preserved buildings:
· The main building of the Krasny Bogatyr factory, built in 1911, designed by Gustav Gelrich, a renowned master of Moscow Art Nouveau;
· A one-story extension to the main building, designed by Gustav Gelrich, built in 1911;
· The constructivist fire station building, designed by Alexander Kurovsky, built in 1933;
· The textured 4-story boiler house, built in 1946;

​

The project envisions a picturesque, permeable development with varying heights from 7 to 35 stories. The composition of volumes, consisting of closed blocks and towers of varying heights, creates a vibrant silhouette and creates public, semi-private, and private spaces between the buildings.

bottom of page